Pre-Conference Seminars:
- Floodplain 101
- Revising Your Maps - Insight on the LOMR-CLOMR Process
- LOMR / CLOMR / PMR (MT-2) Technical Review, Brian Chaille, P.E. CFM
- LOMR/CLOMR Process, Christopher R. Hanstad, CFM
- Engineering Ethics for Consultants and Academics, David T. Williams, Ph.D., P.E., P.H., CFM, D.WRE
- EPA SWMM Workshop
Sessions:
- 1A_Redefining the Floodplain Helping Citizens Obtain LOMCs
- 1A_Regulating Poo Waste Disposal in the Floodplain
- 1A_What Every Community Official Needs to Know About Flood I
- 1B_DuPage County Water Quality BMPs and Water Control Volume
- 1B_McHenry Co Future BMP Requirements
- 1B_New BMP Requirements in N.E. Illinois
- 1B_Stormwater Ordinance Requirements in NE Illinois Final
- 1B_Watershed Management Ordinance Update & Potential BMP Req
- 1C_A New Era in Inundation Mapping
- 1C_Churchill Woods Dam Removal
- 1C_The Challenges of Establishing Floodways With Unsteady-St
- 1D_Mundelein Wastwater Treatment Plant Wetland Mitigation Si
- 1D_Scottswood Area Wetland Project
- 1D_Unique Components of the West Branch Wetland Restoration
- 2A_Coal Ash Impoundment Assessments
- 2A_Lakes ALERT System
- 2A_Reeseville Railroad Bridge Design Improvements in Respons
- 2B_A Local Officials Guide to Increased Cost of Compliance
- 2B_Economic Modeling of Flood Prone Areas
- 2B_What Has Limited the Risk of Damages in Western Cook Coun
- 2C_Developing an Effective EPA 319 Watershed-Based Plan
- 2C_Integrating NPS Modeling into Your Watershed Management P
- 2C_Using Software to Manage the MS4 Permit
- 2D_BMP Design & Construction Issues
- 2D_BMPs on a Tight Budget
- 2D_PrairieWalk Pond IAFSM Final
- 3A_Is it a Levee or a Dam
- 3A_Real Life Experiences Pursuing Levee Accreditation
- 3A_Testing the Glen D. Palmer Dam (Yorkville Dam) Bypass Cha
- 3B_CNMS-Coordinated Needs Management Strategy
- 3B_Risk MAP
- 3B_The Preferred Risk Policy Extension for state and local
- 3C_Garvin Brook Bridge Failure Presentation
- 3C_IDOT Construction Stormwater Management
- 3C_Village of Bartlett Village-Wide Drainage Improvements
- 3D_Integrated Rainwater Harvesting using Weather Based Contr
- 3D_Water Feature Fed by Stormwater Runoff in Normal, IL
- 4A_Fort Dodge Stormwater Master Planning
- 4A_Heritage Park Flood Control Facility
- 4A_Stormwater and Flood Management Case Studies
- 4B_Applying FEMA’s “Reasonably Safe From Flooding” Technical
- 4B_Intro to CRS
- 4B_SI-SD During Non_Disaster Times 2011
- 4C_How is mitigation playing in Peoria
- 4C_How NOT to do Repetitive Loss Buyouts
- 4D_Kinnickinnic River Property Acquisition Process
- 4D_Runoff Volume - a Cup or a Bowl
- 4D_Stormwater Volume and Treatment Methods Simplifying the N
- 5A_NEXRAD for calibration
- 5A_Redefining the 100-Year Storm Event
- 5A_USGS Web Tools for Flood Response and Warning
- 5B_DuPage Co Flood Control Operations
- 5B_Updating the DuPage Co Ordinance
- 5B_West Branch DuPage River Watershed Plan
- 5C_Glenview Local Drainage Inspection Program
- 5C_How Can a Stormwater Utility Help Your Community
- 5C_Stormwater Utility Financing in Decatur
- 5D_Bioengineering Streambank & Shoreline Stabilization Lesson
- 5D_Lessons Learned - In-Stream Construction
- 5D_Stream Restoration Design and Implementation in Urban Environments
Plenary & Lunch:
Wednesday:
- 2011 Welcome & Sponsors
- 01_Plenary_Levees Roles & Responsibilities
- 01_Plenary_USACE PL 84-99 Levee Inspection and Certification
Thursday: